



Job location: Heath, TX
Services: Tunnel per foot under slab, Dig Access Hole, Repair 4" Drain Line up to 5'. Call Description:
Access at cleanouts
5 foot of tunneling on main
Cut out and replace the failed section of pipe
Install offset brackets to the foundation to secure the main line for the future
Backfill upon completion
Additional charge if removal is necessary
Additional charge of heavy rock removal is necessary
Additional charge if concrete chipping or removal is necessary
Work Performed:
Came out and cut out existing failed pipe, replaced fittings and reconnected with code approved fittings. Verified all work upon completion for proper operation. Pictures attached.