Job location: Rockwall, TX
A master bathroom shutoff valve was replaced and extended by cutting into the wall and installing new PEX piping with a shutoff valve. During the same visit, a new Kohler toilet was installed with a fresh wax ring, flex line, and bolts. The system was tested for proper operation and the work area cleaned.
Key Facts
- Service: Fixture Install
- Location: Rockwall, TX
- Technician: Evan
- Completed: October 21, 2026
Called out to replace and extend a shutoff valve in the master bathroom. Upon arrival, we did some investigation and gave the customer pricing. After the customer approved the pricing, we started by shutting off the water to the house and letting the whole system drain.
We then cut open an access hole in the wall, extended the PEX pipe down, stubbed it out of the wall, and installed a new PEX shutoff valve. While on site, the customer also asked us about setting his new Kohler toilet. We gave him pricing for that. After he approved it, we installed the toilet, installed a new flex line, installed a new wax ring, and new bolts.
We reinstated water, checked everything for proper operation, and cleaned our work area. All pictures attached.
Service area: Rockwall, Royse City, Rowlett, Garland, Plano, Highland Park, University Park
Hours: Available 24/7 — no overtime charges
Licensed: TX Master Plumber #41106. Fully licensed and insured.
Credentials: BBB A+ Rated · Family-Owned Since 1970
Contact: (214) 729-3586
Serving customers since 1970.